Removal and replacement of vandalized instrument cable- client NPDC (SEPT 2022-NOV 2022): Men of Pleroo International Laying cables on site
Pleroo men on site for the swapping of damaged control valve from well 31 to well 30- client NPDC (NOV 2022)
Pleroo workmen on site for the removal and installation of faulty 14’’ bulk header gasket – client NPDC (NOV 2022)
Clamping of 12 ’’ leak point at Komkom– client NPDC/MSA (29th NOV-15th JAN 2023):