Removal and replacement of vandalized instrument cable- client NPDC (SEPT 2022-NOV 2022): Men of Pleroo International Laying cables on site
![image1 image1](https://pleroointernational.com/wp-content/uploads/2023/08/image1-260x600.jpeg)
![image2 image2](https://pleroointernational.com/wp-content/uploads/2023/08/image2-260x600.jpeg)
![image3 image3](https://pleroointernational.com/wp-content/uploads/2023/08/image3-260x600.jpeg)
![image4 image4](https://pleroointernational.com/wp-content/uploads/2023/08/image4-260x600.jpeg)
Pleroo men on site for the swapping of damaged control valve from well 31 to well 30- client NPDC (NOV 2022)
![image5](https://pleroointernational.com/wp-content/uploads/2023/08/image5-1024x461.jpeg)
Pleroo workmen on site for the removal and installation of faulty 14’’ bulk header gasket – client NPDC (NOV 2022)
![image6 image6](https://pleroointernational.com/wp-content/uploads/2023/08/image6-260x600.jpeg)
![image7 image7](https://pleroointernational.com/wp-content/uploads/2023/08/image7-260x600.jpeg)
Clamping of 12 ’’ leak point at Komkom– client NPDC/MSA (29th NOV-15th JAN 2023):